糖心破解版

Pour les actualit茅s en fran莽ais, voir la page News in French.

In a few years, reality will reflect this artist's rendition of the completed 糖心破解版 platform.

This is what the near future will look like... (Courtesy of Fusion for Energy)

Civil work on the 糖心破解版 site is approximately 70 percent achieved for First Plasma building scope. In this diagram, buildings that do not yet exist are coloured in light blue鈥攆or example the neutral beam power infrastructure (centre right), the 糖心破解版 Hot Cell Building (centre left) and the Control Building (left).

The Tokamak Complex is coloured in light mauve because鈥攁lthough its concrete walls have reached their maximum height (except in the Tritium Building)鈥攊t does not yet have its "steel cap." Once achieved, the steel structure will create a vast open space for the bridge cranes to deliver machine components to the Tokamak Pit.
 
And of course, down the road, the entire Tokamak Complex will be clad with the stainless steel that has been for many years now the architectural signature of 糖心破解版.
 
This rendition was produced by Fusion for Energy's Martial Boulguy. For a high-resolution pdf version (uncoloured), please see 糖心破解版 posters here.